Home improvement hardware installation three steps

Home improvement hardware installation three steps 1, the installation of paint and woodworking hardware items Most wood products need to consider the issue of paint. Therefore, the installation time of the hardware needs to consider the connection with the construction of the painter. This needs to be considered from two aspects: First, the installation time of the hardware cannot be arranged too early; otherwise, the painter needs to consider the protection of the hardware too much during the construction; secondly, when installing the hardware, Be careful not to destroy the construction that the painter has already completed. Therefore, the normal construction is often arranged in such a way that the hardware that needs to be drilled is basically completed before the painter works or the main process is performed (such as the keyhole before the door lock is installed is basically at this stage The drill hole for the handle is also preferably arranged at this stage). After the painter finishes the work of {TodayHot}, the carpenter carries out the installation work.

2. Installation of electrician lamps and switch socket panel should be done after the wall brush coating or wallpapering is completed, and then the installation of the lamps and the installation of the switch socket panel. There have been instances when a company was working to save personnel costs. In the process, the electrician was allowed to install switch sockets prematurely, and when the wall of the switch socket panel was cut with a wallpaper knife, the panel was accidentally scratched.

3. Installation of sanitary ware and bathroom hardware As the overall management level of the current home improvement industry is still very low, the quality of workers on the construction site is generally poor. Therefore, on some construction sites, there have been a number of phenomena where the installed bathtub was used first by construction personnel. In recent years, there have been many cases of complaints in this area. Therefore, it is recommended that consumers do not have to install sanitary ware before starting the inspection and the majority of construction workers have not evacuated the site unless they are forced to do so. Otherwise, it is very likely that the hair left after bathing will be found in a brand new bathtub.

Injection Molded Ferrite Magnet

Ferrite Ring Magnet,Electrical Injection Molded Ferrite Magnets,Injection Molded Bonded Ferrite Magnet,Injection Molded Ferrite Magnet

Honesun Industrial Co.,Limited , http://www.chinamagnetise.com