Power socket installation seven steps how to arrange more beautiful

The power outlet is indispensable in our home life, and it is basically encountered in decoration and hydropower. The reasonable layout is not only beautiful, but also makes us more convenient and safe in life. So what steps are the outlets installed? More beautiful, then let's take a look!

Power socket installation seven steps :

1. The conductors on the socket need to use the cross-section of the copper wire. When wiring, the fire wire must enter the switch. The principle of the zero wire into the lamp head must be provided with a leakage protection device.

2, the general position of the socket is best not to be less than 1.8 meters, concealed if the ground can not be less than 0.3 meters, concealed, then draw a frame on the wall to dig pits, the depth and the thickness of the socket, the kitchen And the broadcast of the bathroom should be more than 1.5 meters, and the air conditioning should be more than 2 meters.

3, the bedroom headboard and other places to do more two-hole broadcast, the kitchen uses high-power electrical appliances, it is recommended to do more three-hole socket. And to use a separate socket to avoid overload, the three-hole socket must be grounded.

4, the need to conceal the proposed proposal to draw a frame, and then dig the hole by the frame line, the depth of the pit to be as thick as the socket.

5. Secure the bottom of the pit with a plastic plate, pass the three wires through the mounting box, and then fix the mounting box. 6. Pass through the insulation of the three wire heads of the mounting box to expose the copper wire. Separate the wires. Connect the socket base with the corresponding position.

6. After the three wires have been connected, the broadcast seat can be fixed in the mounting box.

How to arrange the power outlet :

1. The living room is the most active place for people in the home. Each wall must have a power outlet. It will be more convenient to use. If the wall length exceeds 3.6 meters, it is recommended to increase the number of outlets if the wall length is less than 3 meters. It is recommended that the power outlet be installed in the middle of the wall. Sockets should be installed near the TV and the air.

2. The two symmetrical walls of the bedroom should be equipped with a combination power outlet. The sides of the bed should also be equipped with power outlets and air-conditioning outlets. If there are TV sets or desks, etc., the desk lamps must be equipped with corresponding outlets.

3. In addition to bookcase walls and air-conditioning sockets in the study, desks and small sofas can be set up to use sockets.

4, if the restaurant, you can set the power outlet next to the table, usually boil a hot pot or charge a meal while dining is also more convenient.

Article Summary: The above is to introduce the seven steps of power socket installation and how to arrange more beautiful related content, hoping to bring some help to everyone, the rationality of the arrangement of the power outlet in the family is very important, directly affect our daily lives usage of.

The valve is a series of gas emergency Shut Off Solenoid Valves, specially designed as gas pipe breaker for emergency use. It can be connected with gas leaking detection sensor, fire alarm circuit or other intelligent sensor modules so that on site or remote shut down on gas supply (manually or automatically) is possible, hence ensuring the safety on gas usage. The valve features an auto-close when strong vibration is detected. After close, manual operation is required to turn on the valve. This feature meets safety regulations in the event of an accident.

Solenoid Valve

Gas Solenoid,Solenoid Valve,Gas Solenoid Valve,Solenoid Operated Valve

Rictron Industrial Co , https://www.szrictron.com